SciELO - Scientific Electronic Library Online

 
vol.30 issue1A case study on maximising the profitability of a form fill and seal machine by optimising interruption intervalsPreventive maintenance using Reliability Centred Maintenance (RCM): A case study of a ferrochrome manufacturing company author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

Abstract

DU TOIT, A.; JOOSTE, J.L.  and  CONRADIE, P.D.F.. Improving the response time for the corrective maintenance of rail infrastructure: a case study of the Western Cape Passenger Rail Network. S. Afr. J. Ind. Eng. [online]. 2019, vol.30, n.1, pp.235-247. ISSN 2224-7890.  http://dx.doi.org/10.7166/30-1-1909.

Response time for repairing rail infrastructure failures remains a challenge in the South African rail industry. The 'mean time to return' metric consists of mean time to respond and mean time to repair. This article investigates the mean time to respond for signalling infrastructure at the Passenger Rail Agency of South Africa (PRASA) in the Western Cape, and introduces a strategy to reduce downtime. The results show that the time of occurrence, the location, and the nature of incidents, as well as the location of maintenance personnel, influence the time to respond. A model is developed to assist with improved decision-making.

        · abstract in Afrikaans     · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License