SciELO - Scientific Electronic Library Online

 
vol.111 número2 índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

J. S. Afr. Inst. Min. Metall. vol.111 no.2 Johannesburg  2011

 

JOURNAL PAPER

 

Meeting the reduced availability and rising costs of electrical power: Anglo Platinum ventilation and cooling strategies

 

 

M. Biffi; D. Stanton

Anglo Platinum

 

 


SYNOPSIS

The reality of rising electrical power costs and the haunting prospect of decreasing electrical power availability are a threat to the growth of new projects and expansion programmes that could negatively affect the sustainability of mining operations. These threats require the adoption of effective power saving measures aimed at three principal objectives: the elimination of wastage, the reduction of power usage particularly during peak demand periods and, more importantly, improving the efficiency of high power-demand processes. It is reasonable to assume that the greatest impact will be achieved by concentrating on those processes that are large electrical power consumers.
For Anglo Platinum operations, mine ventilation and, currently to a lesser extent, mine cooling are two continuous processes that fall in this category. It is estimated that these may consume fifteen to thirtyfive per cent of the power delivered to the shaft head-depending on the shaft's design.
Mine ventilation systems suffer from inherent, historical inefficiencies that lead to excessive power consumption. Air cooling systems are designed to be energy-wise in terms of modulating refrigeration plant operation to meet the underground requirements while maximizing use of 'free' cooling from surface conditions. Currently about ninety-five per cent of the refrigeration capacity used in Anglo Platinum mines is dedicated to surface bulk air coolers. The net thermal efficiency of these systems is compromised as mines expand in depth and on strike. Looking to the future, this practice will be complemented by more energy demanding underground cooling tactics requiring considerably higher electrical power consumption per unit ton produced.
To counter this increase in power consumption, more energyefficient systems and advantageous transient strategies such as thermal storage and the use of ice-on surface and possibly even underground-are being considered.
This paper describes work currently undertaken and planned by Anglo Platinum operations to reduce power consumption by main fans during off-shift periods, the associated efforts currently introduced to reduce underground air leakage, the possibility of introducing more efficient auxiliary ventilation systems, the feasibility of thermal storage, and a brief look at energy recovery system as a means of countering the anticipated power demand associated with underground cooling.

Keywords: Mine ventilation, mine air cooling, energy efficiency, chilled service water, energy recovery, air wastage, fan selection


 

 

“Full text available only in PDF format”

 

 

References

KRAMERS, A.P. and BIFFI, M. Selective Mine Cooling. Chapter 64, Challenges in Deep High Stress Mining, Australian Centre of Geomechanics, Y. Potvin, T.R. Stacey, and J. Hadjigeorgiou (eds.), Perth, 2007.         [ Links ]

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons