Servicios Personalizados
Articulo
Indicadores
Links relacionados
- Citado por Google
- Similares en Google
Compartir
Journal of the Southern African Institute of Mining and Metallurgy
versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253
Resumen
CLAASSEN, J.O.. Yield improvement at a mid-sized coal mine in the Witbank coalfields. J. S. Afr. Inst. Min. Metall. [online]. 2013, vol.113, n.10, pp.761-768. ISSN 2411-9717.
A study was initiated and solutions implemented to address the root causes of a 30°/o^J0°/o lower than predicted product yield achieved at a Mpumalanga coal mine. A holistic MRTM approach, which focused on improving exploration, geological sampling and analysis, geological modelling, planning, mining, and beneficiation practices, was used. The study indicated that deviations in the planned versus actual yields at the DMS plant were caused mainly by incorrect geological yield predictions, high and variable levels of dilution, and near-dense material, as well as the textural properties of the ore.
Palabras clave : MRTM; mining value chain improvement; Witbank coalfields; complex geology.