SciELO - Scientific Electronic Library Online

 
vol.115 número1Fatigue risk management: Charting a path to a safer workplace índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

Resumen

ASSIBEY-BONSU, W.; SEARRA, J.  y  ABOAGYE, M.. The use of indirect distributions of selective mining units for assessment of recoverable mineral resources designed for mine planning at Gold Fields' Tarkwa Mine, Ghana. J. S. Afr. Inst. Min. Metall. [online]. 2015, vol.115, n.1, pp.51-57. ISSN 2411-9717.

For new mining projects or for medium- to long-term areas of existing mines, drilling data is invariably on a relatively large grid. Direct estimates for selective mining units (SMUs), and also for much larger block units, will then be smoothed due to the information effects and the high error variance. The difficulty is that ultimately, during mining, selection will be done on the basis of SMUs on the final close-spaced data grid (grade control), which will then be available, i.e. the actual selection will be more efficient, with fewer misclassifications. However, this ultimate mining position is unknown at the project feasibility stage and therefore has to be estimated. This estimation is required because any cash flow calculations made on the basis of the smoothed estimates will obviously misrepresent the overall economic value of the project, i.e. the average grade of blocks above cut-off will be underestimated and the tonnage overestimated for cut-off grades below the average grade of the orebody. Similarly, unsmoothed estimates will be conditionally biased and will give even worse results, particularly in local areas of short- and medium-term planning or mining. This paper presents a case study of indirect post-processing and proportional modelling of recoverable resources designed for medium-and long-term mine planning at the Gold Fields' Tarkwa Mine in Ghana. The case study compares long-term indirect recoverable mineral resource estimates based on typical widely spaced feasibility data to the corresponding production grade control model as well as the mine production. The paper also proposes certain critical regression slope and kriging efficiency control limits to avoid inefficient medium- to long-term recoverable estimates, and highlights the danger of accepting block estimates that have a slope of regression less than 0.5.

Palabras clave : indirect conditioning; smoothing effect; conditional biases; postprocessing; kriging efficiency; regression slope; information effect.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons