Editorial |
| |
| · Note from the Editor Schutte, C.S.L.
|
| |
Feature Article |
| |
| · Validation of training priorities of engineers in the platinum mining industry in South Africa Motsoeneng, D.; Schultz, C.; Bezuidenhout, A.
|
| |
General Articles |
| |
| · The relationship between project management office maturity and organisational project management maturity: An empirical study of the South African government infrastructure departments Khalema, L.S.; van Waveren, C.C.; Chan, K.-Y.
|
| |
| · Production uncertainties modelling by Bayesian inference using Gibbs sampling Azizi, A.; bin Ali, A.Y.; Ping, L.W.; Mohammadzadeh, M.
|
| |
| · A heuristic approach to minimising maximum lateness on a single machine Çaliş, B.; Bulkan, S.; Turçer, F.
|
| |
| · Model and algorithms of the fuzzy three-dimensional axial assignment problem with an additional constraint Lin, C.-J.; Ma, K.-T.
|
| |
| · Estimating the continuous risk of accidents occurring in the mining industry in South Africa van den Honert, A.F.; Vlok, P.J.
|
| |
| · Peculiarities of single track formation from TI6AL4V alloy at different laser power densities by selective laser melting Yadroitsava, I.; Els, J.; Booysen, G.; Yadroitsev, I.
|
| |
| · Concurrent projects: How many can you handle? Steyn, H.; Schnetler, R.
|
| |
| · Cluster development in the SA tooling industry von Leipzig, K.; Dimitrov, D.
|
| |
| · Technology orientation and effectuation - Links to firm performance in the renewable energy sector of South Africa Urban, B.; Heydenrych, J.
|
| |
| · Effect of milling strategy and tool geometry on machining cost when cutting titanium alloys Conradie, P.J.T.; Oosthuizen, G.A.; Dimitrov, D.M.; Saxer, M.
|
| |
| · Robust design in generalised linear models for improving the quality of polyurethane soles Mares, A.; Dominguez, J.
|
| |
Case Studies |
| |
| · The impact of the maintenance management system: A case study of the PetroSA GTL refinery Mahlangu, B.P.; Kruger, L.P.
|
| |
| · The applicability of the Centeno, Chaudhary and Lopez repair time standard methodology in a rail maintenance environment Rommelspacher, K.O.; Fourie, C.J.
|
| |
| · A two-phased multi-criteria decision-making approach for selecting the best smartphone Yildiz, A.; Ergul, E.U.
|
| |
| · Delivery challenges at a mechanical testing centre facility: A case study of a railway system in South Africa Masithulela, F.; Ramdass, K.
|
| |