SciELO - Scientific Electronic Library Online

 
vol.25Analysis of Patient Safety Incident reporting system as an indicator of quality nursing in critical care units in KwaZulu-Natal, South AfricaConsciring subjects: Q methodology described índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Health SA Gesondheid (Online)

versión On-line ISSN 2071-9736
versión impresa ISSN 1025-9848

Resumen

MBOWENI, Sheillah H.  y  MAKHADO, Lufuno. Challenges influencing nurse-initiated management of antiretroviral therapy training and implementation in Ngaka Modiri Molema district, North West province. Health SA Gesondheid (Online) [online]. 2020, vol.25, pp.1-11. ISSN 2071-9736.  http://dx.doi.org/10.4102/hsag.v25i0.1174.

BACKGROUND: The increasing number of people testing human immunodeficiency virus positive and who demand antiretroviral therapy (ART) prompted the Department of Health to adopt World Health Organization's task shifting where professional nurses (PNs) initiate ART rather than doctors. This resulted in decentralisation of services to primary healthcare (PHC), generating a need to capacitate PNs on nurse-initiated-management of ART (NIMART). The impact of NIMART was assessed and even though there was an increased number of patients on ART, the quality of care is of serious concern. AIM: The aim of this study was to explore and describe the challenges influencing NIMART training and implementation amongst PNs and programme managers. SETTING: The study was conducted from the PHC facilities, in the rural districts of the North West province. METHODS: An exploratory programme evaluation and contextual research design was used in the study. Purposive sampling was used. Focus group discussion (n = 28) and individual interviews were used to collect data. Data was analysed using ATLAS.ti software RESULTS: The results revealed two themes: inadequacy in NIMART training and the healthcare system challenges that influence NIMART training and implementation. Theme 1 included among others the lack of standardised curriculum and model or conceptual framework to strengthen NIMART training. And theme 2 included patient and district healthcare structural system. CONCLUSION: There a need to improve NIMART training and implementation through the standardisation of NIMART curriculum, introduction of pre-service NIMART training in institutions of higher learning, addressing staff shortages and negative attitude of PNs providing ART.

Palabras clave : HIV programme; NIMART implementation; NIMART training; PHC facilities; professional nurses.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons