SciELO - Scientific Electronic Library Online

 
vol.21 número1Development of a more applied version of coherency called 'sensible coherency' for assessment of financial risk measuresA case study on maximising the profitability of a form fill and seal machine by optimising interruption intervals índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

    Links relacionados

    • En proceso de indezaciónCitado por Google
    • En proceso de indezaciónSimilares en Google

    Compartir


    South African Journal of Industrial Engineering

    versión On-line ISSN 2224-7890

    Resumen

    OGANO, N.O.  y  PRETORIUS, L.. Quality performance: The case of construction projects in the electricity industry in Kenya. S. Afr. J. Ind. Eng. [online]. 2010, vol.21, n.1, pp.167-178. ISSN 2224-7890.

    Pressure from the Government of Kenya to have citizens connected to electricity as a means of improving their standard of living has resulted in a focus on the electricity utilities to expand the power distribution network. Contractors have therefore been approved to expedite the process. This has, however, resulted in sub-standard work being done by some of the contractors. The main objective of the research is to determine the critical factors that are instrumental in the delivery of quality construction projects for the electricity industry of Kenya. The results of the research reveal that there are areas in which the electricity utilities and the associated contractors perform poorly, indicating the need to improve the quality of completed projects.

            · resumen en Africano     · texto en Inglés     · Inglés ( pdf )