SciELO - Scientific Electronic Library Online

 
vol.30 número1A review of manufacturing resources planning models under different uncertainties: State-of-the-art and future directionsProposed business process improvement model with integrated customer experience management índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


South African Journal of Industrial Engineering

versão On-line ISSN 2224-7890
versão impressa ISSN 1012-277X

Resumo

HATTINGH, E.; VAN WAVEREN, C.C.  e  CHAN, K.-Y.. A learning curve theory perspective on projects. Ranking the key determinants to improve project efficiency. S. Afr. J. Ind. Eng. [online]. 2019, vol.30, n.1, pp.37-53. ISSN 2224-7890.  http://dx.doi.org/10.7166/30-1-1886.

The desire to gain knowledge about the quality and timing of construction projects delivered to clients has become an increased focus point in the field of construction management. Clients have expectations that are often based on their assumptions about the validity of making the learning curve theory applicable to construction projects. This research aims to determine what criteria need to be met for the learning curve theory to have some validity for construction projects. The results from the questionnaire survey, completed by professionals from the construction industry, show that several concepts were found to be of importance: project specifications, design, scope, budget, site management, planning, monitoring and controlling, and quality. If these concepts correspond between two projects, the chance of successfully applying the learning curve theory increases. Practical recommendations are made that highlight the concepts identified as critical for the successful application of the learning curve theory to construction projects, and that can be used by clients and contractors as a basis for negotiating project schedules.