SciELO - Scientific Electronic Library Online

 
vol.122 número6The development of a time-based probabilistic sinkhole prediction method for coal mining in the Witbank and Highveld coalfields índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

MACROBERT, C.J.; WATES, J.; COETZEE, A.  e  HOWELL, G.. GISTM: Who are the responsible individuals?. J. S. Afr. Inst. Min. Metall. [online]. 2022, vol.122, n.6, pp.299-304. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/1918/2022.

The Global Industry Standard on Tailings Management (GISTM) requires mining companies to make four key appointments as part of their tailings management structure. These four positions are an Accountable Executive with policymaking responsibilities, a Responsible Tailings Facility Engineer with operational responsibility, an Engineer of Record to ensure facilities are designed, operated, and closed safely, and an Independent Tailings Review Board to assess safety drivers regularly. Little guidance on the traits of these individuals is available in a South African context. Consequently, the tailings community of practice was surveyed to develop a table of ideal competencies and establish the flexibility in meeting these traits.

Palavras-chave : tailings; safety; GISTM; management structure; responsible individuals.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons