SciELO - Scientific Electronic Library Online

 
vol.108 issue1 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Share


    Journal of the Southern African Institute of Mining and Metallurgy

    On-line version ISSN 2411-9717Print version ISSN 2225-6253

    J. S. Afr. Inst. Min. Metall. vol.108 n.1 Johannesburg Jan. 2008

     

     

     

    Durban Harbour tunnel - first use of a slurry tunnel boring machine in South Africa

     

     

    J.A. HindmarchI; A.L. GriffithsII; A.K. OfficerII; G. WittnebenIII

    IMott MacDonald, UK
    IIGoba (Pty) Ltd, South Africa
    IIIHochtief-Concor JV, Germany-South Africa

     

     


    SYNOPSIS

    Durban Harbour in South Africa is one of the continent's busiest ports. However, the harbour entrance is currently too small for the new generation of container ships. Therefore it is to be deepened and widened by the National Ports Authority in the near future. An existing immersed tube tunnel carrying major sewer, water and other utilities under the harbour first needs to be removed and replaced by a deeper 4.4 m ID services tunnel. Construction of the deeper tunnel saw the first use of a slurry machine in South Africa and was required to negotiate grades up to 20%.


     

     

    “Full text available only in PDF format”